
Inserters operate on single phase 277 V while Assemblers are 3 phase.įurther, the use of effectivity modules produces a harmonic in the power supply that causes the current and voltage to be out of phase by 5 degrees. Step 3 - provide wiring diagram for the nearby breaker box. Be sure to account for loss in the line - figure on a 2,000 ft long conductor length.
#Spacechem story plus
Step 1 - do a load study to determine the additional demand (include additional power requirements from inserter operations plus existing power usage - "click on local power pole").

Currently, enough power can be provided by the steam generators, but the local feeder (3-4/0 Cu catenary) and step down transformer(13.2kV to 480 V - 1,000 KVA), may or may not have sufficient capacity for the additional load.
#Spacechem story upgrade
Marbles wrote:What about Electrical Engineering I am not an EE, but I'll take a swipe at it - You need to upgrade your Green Circuit production by switching out your 5 Assembler #2s and installing assembler #3s. It should be a good game but I wish they put up some video.

Xnmo wrote:Spacechem? In 3D? It's already complicated enough in 2DģD usually makes it easier to route stuff around.
